Tunnel to be squeezed during repairs
The L-H-Lafontaine tunnel is going to be squeezed down from six to four lanes for two years while repairs are made – and at the same time as the Turcot and Champlain reconstruction.
The L-H-Lafontaine tunnel is going to be squeezed down from six to four lanes for two years while repairs are made – and at the same time as the Turcot and Champlain reconstruction.
Kam 21:27 on 2012/07/16 Permalink
Beautiful! Well planned Montreal!