Lysiane Gagnon
marvels at the CHUM's wasteful flipflopping on its construction plans. She doesn't say, but the CHUM's contortions are pretty much mirrored by its mirror institution, the MUHC, which has been zigzagging between starting construction at the Glen site and enlarging the Montreal General, in much the same way (with the additional twist that they have to deal with the Shriners issue as well).
posted at 12:57